Earthwork bid estimation — AI calculates volumes for you
Earthwork bid estimation starts with calculating soil volumes. Massoi reads blueprints and calculates cuts, fills, and hauling volumes automatically — you focus on pricing.
Earthwork bid estimation: volumes, soil types and hauling
An earthwork bid stands or falls on the accuracy of the volume takeoff. Cut and fill volumes are determined by comparing the existing ground surface with the planned grade, either from cross-sections or a terrain model (3D). Because volume is the product of the elevation difference and the area, even a small error in the starting grade can change the total volume by tens of percent over a large area. That is why volumes are calculated per area and per lift, and cut and fill are separated into their own line items.
The soil type decides both the equipment and the price. Excavating normal soil with an excavator typically costs $50–200/CY, whereas rock removal rises to $150–400/CY depending on the rock and the need for blasting. Clay, sand, glacial till and rock require different methods, and groundwater conditions and the excavation depth may require shoring (sheet pile or retaining wall) and dewatering. Soil types must be identified from the geotechnical report already at the estimating stage — a wrong soil assumption is one of the most common reasons for underpricing.
Hauling is often the single largest cost item in an earthwork contract, and it also hides the most important estimating error: swell. When excavated, soil swells, so the loose volume to be hauled is larger than the in-place bank volume. Clay swells by about 25–40 %, glacial till 15–25 % and sand 10–15 %. If hauling is priced on the theoretical bank volume without a swell factor, the haul cost is systematically understated. In addition, the handling of any contaminated soil, disposal fees and the haul distance must be accounted for per soil type.
Massoi calculates cut and fill quantities automatically from the drawings, breaks out the soil types and accounts for swell factors in the haul volumes. With the quantities and haul volumes ready per soil type, the contractor can price excavation, hauling, fill and shoring realistically and compare, for example, the cost of reusing material on site versus hauling it off.
Challenges in earthwork bid estimation
Soil volume estimation is difficult
Cuts and fills are based on ground level differences. Even a small error in elevation multiplies in cubic yards.
Different soil types, different prices
Rock, glacial till, clay, and sand require different equipment and different pricing. Soil type identification significantly affects bid price.
Hauling costs
Soil hauling is often the single largest expense. Swell factor, haul distance, and disposal fees must be estimated precisely.
How does AI-powered earthwork bidding work?
Upload site plans
Upload site plans and cross-sections. Massoi compares existing and proposed grades.
AI calculates volumes
AI calculates cut and fill volumes, accounts for swell factors, and breaks down by soil type.
Add hauling and bid
Review volumes, add unit prices for excavation, hauling, and fill by soil type — submit your bid.
Earthwork price guide 2026
Indicative prices including materials and labor.
| Work | Price | Note |
|---|---|---|
| Excavation (normal soil) | $50-200/CY | With excavator, no blasting |
| Rock removal / blasting | $150-400/CY | Depends on rock quality and blasting needs |
| Soil hauling | $12-30/CY | Depends on haul distance |
| Backfill and compaction | $15-50/CY | With crushed stone, layer-by-layer compaction |
| Trenching | $6-15/lf | Pipe + gravel fill + filter fabric |
| Site grading | $1-3/sqft | Machine grading |
| Topsoil removal | $2-4/sqft | Strip and stockpile |
| Shoring / retaining | $40-120/sqft | Sheet pile or retaining wall |
Try how AI calculates soil volumes from blueprints in seconds.
Frequently asked questions about earthwork bid estimation
How are soil volumes calculated for a bid?
Soil volumes are calculated by comparing the existing ground surface to the planned grade. Cut and fill volumes are calculated from cross-sections or a 3D model. Accurate quantity takeoff is critical, because an error in cubic yards multiplies in hauling costs.
How much does excavation cost per cubic yard?
Excavation in normal soil costs $50-200/CY. Rock removal costs $150-400/CY. Price is affected by soil type, excavation depth, and haul distance.
How is soil swell accounted for?
Soil swells by 10-40% when excavated. Clay swells approximately 25-40%, sand 10-15%, and glacial till 15-25%. Loose volume is greater than bank volume.
Related content
Concrete Bid Estimation | AI Calculates Volumes & Quantities
Concrete bid estimation with AI. AI calculates concrete volumes and formwork from blueprints automatically. Concrete wo…
Waterproofing Bid Estimation with AI
Waterproofing bid estimation with AI. AI calculates waterproofing surface areas from blueprints automatically. Waterpro…
Roof Replacement Cost 2026 | Materials, Labor, and Total Cost
Roof replacement cost 2026: metal $10–18/sqft, tile $12–25/sqft, asphalt shingles $4–9/sqft. See a full price compariso…
Bid Estimation for Construction — AI Calculates in Minutes
AI-powered bid estimation: upload a blueprint, AI does the quantity takeoff and pricing. Complete bid in minutes. Try f…